| VERTICAL TYPE COOLING TUNNEL
A filled Mold
Tray travels into the vertical
cooling system, which accommodates
about 200 pcs of trays to harden
the product prior to demolding.
The temperature inside the cooling
tunnel is about 4 - 7‹C
and travel time inside is about
10 minutes.Length-2.92 m, Width-2.3m,
Height-2.9m
Power requirement:
9.75 kW/h |